РЫЧАГ ПЕРЕКЛЮЧЕНИЯ ПЕРЕДАЧ В СБОРЕ УСТАНОВКА

PROCEDURE

  1. INSTALL FLOOR SHIFT LEVER ASSEMBLY

    1. Install the floor shift lever assembly with the 4 bolts.

      Момент затяжки
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

    1. Engage the 2 claws to install the transmission control cable assembly to the floor shift lever assembly.

      A012FZO
      Note:

      Make sure that the claws are firmly engaged.

    2. Connect the transmission control shift cable to the floor shift lever assembly.

    3. Connect the transmission control select cable to the floor shift lever assembly with the clip.

      Note:
      • Make sure the lock piece of the transmission control select cable length adjustment structure is facing upward when the transmission control select cable is connected.

      • Make sure that the transmission control select cable is securely installed.

    4. Engage the 4 clamps to connect the wire harness to the floor shift lever assembly.

  3. ADJUST TRANSMISSION CONTROL CABLE ASSEMBLY

    Click hereНажмите здесь

  4. INSTALL REAR CONSOLE BOX ASSEMBLY (for Hatchback, Wagon)

    Click hereНажмите здесь

  5. INSTALL REAR CONSOLE BOX ASSEMBLY (for Sedan)

    Click hereНажмите здесь